| |||
target cost; estimated costs | |||
budgeted costs | |||
budget costs | |||
budget at completion (The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved) | |||
planned cost | |||
planned costs; scheduled costs; target costs | |||
budgeted cost | |||
standard cost | |||
| |||
standard costs |