English | Spanish |
acquisition date | fecha de adquisición (The date that an asset is acquired) |
app proceeds to date | ganancias por la aplicación hasta la fecha (Receipts after the Windows Store fee has been subtracted) |
begin date | fecha de inicio (The date when a project or task is scheduled to begin) |
best before date | fecha de consumo preferente (A recommended date for obtaining the optimum quality or characteristic of a product) |
capture date | fecha de captura (The date when a digital photograph was taken) |
check date | fecha del cheque (The date on the check) |
close date | fecha de cierre (The date on which an opportunity is closed, either because it resulted in a sale or was unsuccessful) |
confirmed receipt date | fecha de recepción confirmada (The date the selling company confirms that a customer or vendor will receive the goods) |
cycle end date | fecha de finalización del ciclo (The final date of the active period on which the variable compensation award is based) |
cycle end date | fecha final del ciclo (The final date of the active period on which the variable compensation award is based) |
cycle start date | fecha inicial del ciclo (The beginning date of the active period on which the variable compensation award is based) |
cycle start date | fecha de inicio del ciclo (The defined beginning of a period of time during which cycle items are active and can be acted upon) |
date literal | literal de fecha (Any sequence of characters with a valid format that is surrounded by number signs (). Valid formats include the date format specified by the locale settings for your code or the universal date format) |
date picker | selector de fecha (A control that developers use to allow a user to select a date) |
date picker control | control de selector de fecha (A control that developers use to allow a user to select a date) |
date range | intervalo de fechas (The time span between the start and end dates) |
date separator | separador de fecha (A character that is used to separate the day, month, and year when date values are formatted. The characters are determined by system settings or by the Format function) |
Date/Time | Fecha y hora (A data type used to hold date and time information) |
disposal date | fecha de cancelación (The date that an asset is sold or discarded) |
due date | fecha de vencimiento (The date by which some task or action should be completed) |
early finish date | fecha de finalización anticipada (The earliest date that a task could possibly finish, based on early finish dates of predecessor and successor tasks, other constraints, and any leveling delay) |
effective date | fecha de vigencia (The date at which something goes into effect or becomes applicable) |
end date | fecha de finalización (The date on which a schedule or task ends) |
end date-based | basado en la fecha de finalización (Pertaining to a computer running FlexGo technology that meters computer usage until a defined usage expiration date. The usage expiration date can be extended by days or months, on a recurring basis) |
end date parameter | parámetro de fecha de finalización (A parameter to set an end date) |
expiration date | fecha de caducidad (The date on which something ceases to be effective) |
expiration date | fecha de vencimiento (The date on which something ceases to be effective) |
expiration date | fecha de expiración (The date after which information or a resource is no longer valid) |
Expiration Date option | opción Fecha de expiración (An option on the Policy Filter page for setting an expiration date. This option can be specified for any policy rule) |
finish date | fecha de finalización (The date that a project or task is scheduled to be completed. This date is based on the task's start date, duration, calendars, predecessor dates, task dependencies, and constraints) |
fixed date | fecha fija (A date to which a task is tied either because the date was entered in the Actual Start or Actual Finish field or because the task is constrained by an inflexible constraint) |
futures date | fecha de futuros (An order due date, generated by master scheduling, that is based on lead times for all levels of an item) |
item expiration date | fecha caducidad producto (The date after which an item is no longer usable) |
Last Modified Date/Time | fecha/hora última modificación (The timestamp of the most recent modification of a Navision entity. The modified entries are retrieved from the Change Log. If the Last Modified Date/Time is older than the last synchronization time, then entities will not be synchronized. If The Last Modified Date/Time is more recent, the synchronization will be performed) |
late finish date | fecha límite de finalización (The latest date that a task can finish without delaying the finish of the project. It is based on the task's late start date, as well as the late start and late finish dates of predecessor and successor tasks, and other constraints) |
late start date | fecha límite de comienzo (The last possible date a task could be started if all predecessor and successor tasks also start and finish on their late start and late finish dates) |
long date | fecha larga (The standard long formats to display a date) |
monthly reset date | fecha de restablecimiento mensual (A setting where the user provides the date when their monthly data usage resets to 0) |
monthly reset date | día del mes para restablecimiento (A setting where the user provides the date when their monthly data usage resets to 0) |
opening date | fecha del saldo de apertura (The date on which an opening balance is entered) |
physical date | fecha física (The date a transaction physically occurred, such as the date that an item was received) |
place in service date | fecha de puesta en servicio (The date that an asset is ready and available for service) |
posting date | fecha de registro (The date that a transaction is recorded) |
Preparation of an Opening Balance Sheet at the Date of Transition to IFRS | Preparación de un saldo de apertura en la fecha de transición a los estándares IFRS (A template that addresses, from a Finance & Accounting perspective, the significant activities required of companies to prepare their opening balance sheet at the date of transition to IFRS within the context of a conversion from previous Generally Accepted Accounting Principles (GAAP) to International Financial Reporting Standards (IFRS)) |
program anniversary date | fecha de aniversario del programa (The calendar date which marks the enrollment of a partner into the Microsoft Partner Program, including payment of any applicable membership fees) |
receipt date | fecha de recepción (The date transferred goods are received in a warehouse. Receipt date applies to transfer orders) |
relative date | fecha relativa (A range of dates that is specified by using comparison operators and return data for a range of dates) |
requested receipt date | fecha de recepción solicitada (The date a customer or vendor requests that goods be received) |
retirement date | fecha de retirada (The date that an asset is sold or discarded) |
Set due date | Establecer fecha de vencimiento (An option that allows the user to set the date by which a To Do needs to be completed) |
ship date | fecha de envío (The date that items are shipped from a shipping location) |
short date | fecha corta (The standard short formats to display a date. For example: MM/dd/yy; dd/MM/yy) |
start date | fecha de inicio (The date when a project or task is scheduled to begin) |
status date | fecha de estado (A date that you set [rather than the current date] for reporting the time, cost, or performance condition of a project) |
term end date | fecha de finalización del período (The date at the end of a subscription. For example, in Microsoft Online Services, there are a variety of services that a customer may subscribe to, and each subscription has its own term length (e.g., 6 months, 12 months) and term end date) |
usage expiration date | fecha de expiración de uso (The date and time at which a purchased block of unlimited computer usage time terminates) |