Spanish | English |
consumo de material fijo | fixed material consumption (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length) |
consumo de material variable | variable material consumption (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes) |
documentación y material adjunto | collateral (The end-user manual and any other items that the OEM packages with a new computer) |
etiqueta de material | material label (The unit of measure for a material resource, such as tons, cubic yards, or board feet) |
material de embalaje | packaging material (The material used to bundle goods for protection during shipment) |
material de reflexión difusa | diffuse material (A type of material that determines the color of the 3D object with direct light (white light) applied to it much like the paint on a wall) |
material de reflexión especular | specular material (A type of material that controls the color of the specular highlight on a 3D object) |
material emisor | emissive material (A type of material that causes the object to appear as if it is giving off light. The color of the light is determined by the color of the material) |
material ilimitado | unlimited material (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
material limitado | limited material (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
material limitado | finite material (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
material limitado | infinite material (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
proyecto de tiempo y material | time and material project (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions) |
recurso material | material resource (A supply or other consumable item that is used to complete tasks in a project) |
unidad de gestión de material | handling unit (A uniquely identifiable logistics unit of material that can be transferred, stored, received, and shipped) |