French | English |
estimation ascendante | bottom-up estimating (A principle of good scheduling. It means having those who do the work estimate the effort, rolling up task-level estimates, and recognizing that experience is the best estimating technique) |
estimation de livraison | Need of Delivery (The formula used to determine the time and frequency with which a piece of content is delivered. This formula takes into account the total quantity of content to be delivered, and the length of time over which the quantity must be delivered) |
estimation de projet à prix fixe | fixed-price project estimate (The estimated total cost to complete a fixed-price project) |
estimation d'ordre de grandeur | rough order-of-magnitude estimate (An estimate done without detailed costing, or based on initial or incomplete data. It estimates the general size and scope of a project) |
estimation à l'achèvement | estimate at completion (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI) |