estimation ascendantebottom-up estimating (A principle of good scheduling. It means having those who do the work estimate the effort, rolling up task-level estimates, and recognizing that experience is the best estimating technique)
estimation de livraisonNeed of Delivery (The formula used to determine the time and frequency with which a piece of content is delivered. This formula takes into account the total quantity of content to be delivered, and the length of time over which the quantity must be delivered)
estimation de projet à prix fixefixed-price project estimate (The estimated total cost to complete a fixed-price project)
estimation d'ordre de grandeurrough order-of-magnitude estimate (An estimate done without detailed costing, or based on initial or incomplete data. It estimates the general size and scope of a project)
estimation à l'achèvementestimate at completion (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI)