DictionaryForumContacts

   English
Terms for subject Microsoft containing Materials | all forms | exact matches only
EnglishGerman
bill of material versionStücklistenversion (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions)
bill of materialsStückliste (A list of the components and subassemblies needed to build one unit of a product. A bill of materials also shows quantities for each component)
bill of materials explosionStücklistenaufschlüssselung (The process of identifying the components, and their quantities, that are required to produce an item)
bill of materials itemStücklistenposition (An itemized product defined by a bill of materials)
class materialsKursmaterialien (Content and resources that are made available as part of a class and that can be associated with individual lessons or assignments)
diffuse materialdiffuses Material (A type of material that determines the color of the 3D object with direct light (white light) applied to it much like the paint on a wall)
emissive materialselbstleuchtendes Material (A type of material that causes the object to appear as if it is giving off light. The color of the light is determined by the color of the material)
finite materialbegrenztes Material (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
fixed material consumptionfester Materialverbrauch (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length)
infinite materialunbegrenztes Material (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
keying materialSchlüsselerstellungsmaterial (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication)
limited materialbegrenztes Material (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
packaging materialVerpackungsmaterial (The material used to bundle goods for protection during shipment)
phantom bill of materialPhantomstückliste (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ")
phantom bill of materials itemArtikel in Phantomstückliste (A bill of materials item that is produced but not stocked)
return materials authorization numberRMA-Nummer (A reference number that is used to authorize and track goods returned for repair or refund. A return materials authorization is issued by a sales entity that authorizes a buying company to return goods)
return materials authorization numberRücksendungsnummer (A reference number that is used to authorize and track goods returned for repair or refund. A return materials authorization is issued by a sales entity that authorizes a buying company to return goods)
specular materialglänzendes Material (A type of material that controls the color of the specular highlight on a 3D object)
sub-bill of materialUnterstückliste (A bill of material that makes up a component of another bill of material)
time and material projectAufwandsprojekt (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions)
time and materialsnach Aufwand (A type of contract in which the final price paid is based on the amount of time it took to complete the project and the cost of the materials used)
time and materials projectAufwandsprojekt (A project where the vendor invoices the customer based on work completed on the job. There is a direct relationship between the invoice lines and the usage already performed on the job)
unlimited materialunbegrenztes Material (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
variable material consumptionvariabler Materialverbrauch (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes)