English | Russian |
A function that swaps the order of two values in a tuple. | Функция, меняющая местами два значения в кортеже (Visual Studio 2013 Rori) |
be an order of magnitude faster than | быть на порядок быстрее, чем (Alex_Odeychuk) |
Due date of payment order | Срок оплаты платёжного поручения (Dynamics AX 2009 SP1 Rori) |
rough order-of-magnitude estimate | грубая оценка (An estimate done without detailed costing, or based on initial or incomplete data. It estimates the general size and scope of a project) |
rough order-of-magnitude estimate | грубая оценка (An estimate done without detailed costing, or based on initial or incomplete data. It estimates the general size and scope of a project. Rori) |