DictionaryForumContacts

   Turkish English
A B C Ç D E F G Ğ Hİ J K L M N O Ö P Q R S Ş T U Ü V W X Y Z   <<  >>
Terms for subject Microsoft (14365 entries)
Zamana Bağlı Yerinde Saklama Time-Based In-Place Hold
Zamana Karşı Modu Time Attack Mode
Zamanlama Schedule
zamanlama schedule
zamanlama farkı schedule variance
Zamanlama Görünümü Schedule View
zamanlama grubu schedule group
zamanlama performans endeksi schedule performance index (The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI)
Zamanlama ve Teslim İşlemcisi Scheduling and Delivery Processor
Zamanlama Yardımcısı Scheduling Assistant
zamanlamak schedule
zamanlayıcı hesabı timer account
zamanlayıcı örneği scheduler instance
Zarar potansiyeli Yeniden Üretilebilirlik Kötüye Kullanım Etkilenen Kullanıcılar Bulunabilme Damage potential Reproducibility Exploitability Affected users Discoverability
zararlı ileti sırası poison-message queue
zarflar formülü envelopes formula
zayıf PIN weak PIN
zayıf yanlar, fırsatlar ve tehditler analizi strengths, weaknesses, opportunities, and threats analysis
zayıflama attenuation
zehirli ileti poison message