DictionaryForumContacts

   English Croatian
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z   <<  >>
Terms for subject Microsoft (7070 entries)
Schannel S-kanal
schedule zakazati
Schedule Raspored
schedule raspored
Schedule a Conference... Zakaži konferenciju...
Schedule a Meeting Zakaži sastanak
schedule performance index (The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI) indeks performansi rasporeda
Scheduling Assistant Pomoćnik za planiranje rasporeda
schema shema
schema master glavni za shemu
scope opseg
scope doseg
Scope Djelokrug
scratch area prostor za odlaganje
scratch directory direktorij za odlaganje
scratch-out gesture gesta brisanja
screen zaslon
screen clipping isječak zaslona
screen font zaslonski font
Screen magnifier Povećanje prikaza