critical path (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
critical pathway (CPM-Methode) | |||
slackless path | |||
critical path |
kritischer Weg: 13 phrases in 5 subjects |