| |||
baseline cost (The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved); planned cost (The latest cost of tasks, resources, assignments, and the entire project, which Project displays in the Cost field as cost or total cost) | |||
budgeted costs; planned costs; scheduled costs | |||
total dollars |
geplante Kosten: 1 phrase in 1 subject |
Economy | 1 |