DictionaryForumContacts

   English
Google | Forvo | +
critical path
comp., MS laluan genting (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project)