bill of material versionversão da lista de materiais (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions)
diffuse materialmaterial difuso (A type of material that determines the color of the 3D object with direct light (white light) applied to it much like the paint on a wall)
emissive materialmaterial emissivo (A type of material that causes the object to appear as if it is giving off light. The color of the light is determined by the color of the material)
finite materialmaterial finito (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
fixed material consumptionconsumo de material fixo (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length)
infinite materialmaterial infinito (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
keying materialmaterial para chave (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication)
keying materialmaterial para chaves (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication)
limited materialmaterial limitado (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
material labelrótulo do material (The unit of measure for a material resource, such as tons, cubic yards, or board feet)
material labeletiqueta material (The unit of measure for a material resource, such as tons, cubic yards, or board feet)
material resourcerecurso material (A supply or other consumable item that is used to complete tasks in a project)
packaging materialmaterial de embalagem (The material used to bundle goods for protection during shipment)
phantom bill of materiallista de materiais fantasma (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ")
specular materialmaterial especular (A type of material that controls the color of the specular highlight on a 3D object)
sub-bill of materialsublista de materiais (A bill of material that makes up a component of another bill of material)
time and material projectprojeto por tempo e material (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions)
unlimited materialmaterial ilimitado (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
variable material consumptionconsumo de material variável (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes)