DictionaryForumContacts

   
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z   <<  >>
Terms for subject Microsoft (4152 entries)
Save as type Gardar como tipo
Saved networks Redes gardadas
scale redimensionar
Scan Escáner
scan analizar
scan dixitalización
scan dixitalizar
scan head cabeza de dixitalización
scanner escáner
Schedule Programar
schedule programación
schedule performance index (The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI) Índice de desempeño de programación
Schedule View Visualización de programación
scheduled programado
Scheduling Assistant Asistente de programación
schema esquema
schema validation validación de esquema
schema version versión de esquema
SCL nivel de confianza de correo non-desexado
scope ámbito