DictionaryForumContacts

   English German
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z   <<  >>
Terms for subject Microsoft (19240 entries)
schedule performance index (The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI) Planleistungsindex
schedule variance Planabweichung
Schedule View Planungsansicht
scheduled conference geplante Konferenz
scheduler instance Planerinstanz
Scheduling and Delivery Processor Prozessor für Zeitplanung und Übermittlung
Scheduling Assistant Terminplanungs-Assistent
schema Schema
schema mapping Schemazuordnung
schema master Schemamaster
schema rowset Schemarowset
schema snapshot Schemamomentaufnahme
schema validation Schemaüberprüfung
schema-aware schemafähig
scheme Schema
scheme color Schemafarbe
scientific notation wissenschaftliche Schreibweise
Scissors Schere
Scissors Schere
SCM status indicator lights SCM-Statusanzeigeleuchten